A packaged unit swap is decided on the ground before the crane arrives: curb fit, access, duct condition and utilities. Bleuwave walks the roof first and quotes flat-rate before anything is ordered.
Schedule today — we’re here 24/7.

A packaged unit is the whole system in one cabinet: compressor, coils, blower and heat, bolted to a curb on the roof and fed by two duct openings cut through the deck. Phoenix builders put them up there by the tens of thousands, because a low-slope roof is free real estate and a block-and-stucco tract home has no basement and often no side yard to spare. That decision was made in 1994 by someone who never had to change the unit. Now it is your turn. Replacing a packaged rooftop unit is not a harder job than replacing a split system. It is a different job, and most of what can go wrong is decided before the new unit leaves the ground.
The cabinet is the smallest variable. The rest is logistics.
Rooftop replacement is a choreographed morning. The old unit is disconnected, the gas capped, the power locked out and the refrigerant recovered before the crane arrives. The crane lifts the old unit off, sets the new one on the curb or adapter, and leaves. Everything after that is a crew on a roof: sealing the curb, connecting ducts, wiring, gas, condensate drain, thermostat wire, then startup and charge verification. The crane is usually on site for about an hour. The crew is there most of the day. Nobody sets a unit in a monsoon outflow, and crane operators will not swing a load in high wind, so a July afternoon can slip to the next morning.
A curb adapter is a fabricated transition that sits on the existing curb and matches the new unit's base, supply and return openings. Done well, it is airtight and insulated. Done badly, it leaks conditioned air into the attic through the two biggest holes in your ceiling. Ask to see it. Ask whether the plenums below the curb will be inspected and whether the transition will be sealed with mastic rather than tape. This is the moment when duct sealing is cheapest, because the top of the system is already open. Haboob dust finds every gap, and a leaky curb pulls attic air into the return every time the blower runs.
The crew walks the roof before quoting. Soft spots, ponding near the curb, cracked foam and old penetrations from an abandoned evaporative cooler all get noted. The gas line is pressure-tested, the disconnect and whip are checked against the new unit's requirements, and the breaker is confirmed. If your panel is at capacity, that is a licensed electrician's task, quoted separately and scheduled ahead of the crane. We will not reuse a corroded disconnect because it is convenient.
A bid that arrives without anyone climbing the roof is a guess dressed as a number. The estimates and financing guide explains what a proper proposal contains and how financing on approved credit works.
A packaged unit with a failed capacitor, a worn contactor or a leaking drain pan is not a replacement candidate. It is a repair. A unit with a cracked heat exchanger, a dead compressor or R-22 refrigerant is a different conversation, and the repair-vs-replace guide walks that math honestly. A unit that was never maintained will fail younger; seasonal maintenance is the cheapest insurance a rooftop owner can buy, because nobody else is ever going to look at the thing.
A web page cannot size a system, and it certainly cannot see your roof. Curb dimensions, crane access, duct condition and gas and electrical readiness are physical facts, measured on site. Bleuwave's evaluation is a roof walk and a load calculation, quoted flat-rate before any work begins, with nothing ordered until the numbers check.
Straight answers, no runaround. Don’t see yours? Our team is a phone call away, around the clock.
Someone should be, at least at the start and the end. The crew needs access to the thermostat, the electrical panel and the gas meter, and you will want to see the startup readings before they leave. The crane itself is on the street for a short window; the rest of the day is the crew on your roof.
Sometimes, and only after measuring. Cabinet footprints changed as efficiency standards rose, so many replacements need a curb adapter fabricated to bridge the old opening and the new base. A bidder who does not measure the curb before ordering is planning to improvise on the roof.
Foam that has taken fifteen or twenty summers can be brittle around the curb, and crew traffic plus a new unit's weight can crack it. We note roof condition on the site visit and tell you if a roofer should come first. Fixing the roof after the unit is set is the expensive order of operations.
On most Phoenix streets, yes. Cul-de-sacs, alleys with overhead service lines, and lots with large trees or tight setbacks take more planning, and occasionally a different crane or a different set position. That is a site question, and one reason a rooftop scope cannot be quoted from a photo.
Rarely worth it. Converting means an indoor cabinet location that does not exist, new refrigerant lines, and roof patching where the ducts came through. If the home was built for a rooftop unit, a rooftop unit is almost always the sensible replacement. The exceptions are real but uncommon, and we will tell you if you are one.
Not by itself. The new unit connects to the same plenums and duct runs as before. What replacement gives you is access: the curb is open, the transition is being built, and sealing the top of the system is at its cheapest.
Less than the same cabinet would last somewhere milder, because it sits in direct sun on a roof that reaches 155 degrees and runs long hours from May through October. Maintenance is what moves the number. A unit nobody has looked at in a decade is on borrowed time regardless of its age.
Same-day appointments across Maricopa and Pinal counties. Pick your city for local pricing pages, reviews and service details.
Bleuwave measures the curb, checks access and tests the utilities, then quotes flat-rate before the crane is booked. Call (480) 863-5855.